Permit Benchmarks

Building Permit Activity & Wait Times in Montreal (2026)

19
median days
50.9
average days
18,249
permits (12 mo)
n/a
avg project value

Across 18,249 building permits issued in Montreal, QC over the trailing 12 months, the typical permit took a median of 19 days from application to issuance, with an average of 50.9 days. The average runs higher than the median because a minority of large or complex projects pull the mean upward, which is exactly why the median is the number to plan around.

Montreal permit activity at a glance

MetricValue
Median days to issuance19 days
Average days to issuance50.9 days
Permits issued (last 12 months)18,249
Average permits per month1,521
Average project valuen/a
Cross-city median (6 timing cities)28 days

How Montreal compares

The median across the 6 cities in our dataset that publish processing-time data is 28 days. Montreal sits 9 days faster than that benchmark. A wait time below it means permits here generally move faster; above it means the opposite. Either way, the spread between fast and slow categories within a single city is usually wider than the gap between cities, so the by-work-type table below matters more than any single headline number.

Permit activity by type of work in Montreal

Not all permits move at the same speed. Simple alterations clear far faster than new-building applications. Here is how the most common work types in Montreal broke down over the last 12 months:

Type of work Permits Median days Avg days
Permis neige - 1 stationnement - 1 an 171 7 11.5
Réfection de la toiture par la mise en place d'une membrane blanche. Aucuns travaux de structure. 89 3 4.2
Réfection de la toiture par la mise en place de l'asphalte et gravier blanc. Aucuns travaux de structure. 71 3 5.7
Remplacer le revêtement de toiture en totalité par membrane blanche. Aucuns travaux de structure. Tel que document approuvé. 65 6 8.6
Type2 -À l'extérieur, remplacer la porte d'issue de secours et une fenêtre dans la même ouverture, remplacement localisé de la maçonnerie et travaux de rejointement. À l'intérieur, réaménagement de la salle de rangement. Réfection de la toiture par la mise en place de l'asphalte et du gravier blanc. Le tout tel que les plans. Aucun travaux de structure. 55 44 43.9
REMPLACER LA MEMBRANE DE LA TOITURE PAR UNE NOUVELLE MEMBRANE BLANCHE 55 1 2.2
Type1-À l'extérieur, remplacer la porte d'issue de secours et une fenêtre dans la même ouverture, remplacement localisé de la maçonnerie et travaux de rejointement. À l'intérieur, réaménagement la salle électrique. Réfection de la toiture par la mise en place de l'asphalte et du gravier blanc. Le tout tel que les plans. Aucun travaux de structure. 43 47 46.7
Toit, plat, remplac., en total, gravier blanc 37 21 56.5
CERTIFICAT-MISE AUX NORMES D'UNE PISCINE CREUSÉE 34 33 43.4
RÉFECTION COMPLÈTE DU REVÊTEMENT DE LA TOITURE (TOIT BLANC) 33 1 12.8
REMPLACER LA MEMBRANE DE LA TOITURE PAR UNE NOUVELLE MEMBRANE D'ASPHALTE RECOUVERTE DE GRAVIER DE MARBRE BLANC 32 1 1.7
Réfection de la toiture par la mise en place de gravier blanc. Aucuns travaux de structure. 26 4 4.2

Permit volume trend

Montreal issued 18,249 permits over the trailing 12 months . The busiest single month was Oct 2025 (2,260 permits). Volume drives wait times: months with a surge in applications tend to push processing times up as review staff work through the backlog.

What drives building permit wait times

Permit processing time is rarely about a single step. The biggest levers are:

How to read these benchmarks

These are permit-volume and application-to-issuance timing benchmarks, they measure how long permits that were issued took to get there. They are not approval rates: the underlying dataset has no approval-versus-denial field, so we never report rejection percentages. Use the median as your realistic planning number, the average as your worst-case buffer, and the by-work-type table to set expectations for your specific project. The single best way to stay on the fast end is to submit a complete, compliant application the first time.

Don't add weeks to your own wait.

Most delays come from a resubmission cycle. Upload your development permit application and get an AI-powered compliance check against the actual Vancouver Zoning By-law, Building By-law, and Parking By-law, in under 2 minutes, before you submit. Free analysis, $49 for the certified report.

Check My Permit Application →

Get the free Vancouver Permit Pre-Submission Checklist

The 12-point checklist that catches the issues that send permit applications back for resubmission, plus wait-time alerts for your city. One email to confirm, unsubscribe anytime in one click.

We email a single confirmation link (CASL double opt-in). No spam, one-click unsubscribe on every email.

Compare other cities

See all 30 cities → · Back to the blog →

Source: Wolf Codes permit dataset, 4,291,388 Canadian building permits. Figures cover the trailing 12 months, analysed June 2026. Permit-volume and (where available) application-to-issuance timing benchmarks from the Wolf Codes permit dataset. The data has no approval/denial column, so these are NOT approval rates — they measure how many permits were issued, their declared value, and how long issued permits took where a processing-time field is published. Only cities with at least 50 qualifying permits are reported.